Spektrum 2.9G Linear Servo Long Lead: UMX Timber X (SPMSH2040TL)
The E-flite 2.9g Long Lead Linear Servo provides accurate and responsive control for ultra-micro RC aircraft. Designed specifically as an original replacement part for the popular E-flite Timber X airplane, this lightweight servo ensures precise control surface movement during high-performance maneuvers.
Restore optimal flight performance to your micro RC plane with the authentic E-flite 2.9g Long Lead Linear Servo. Built for high performance and minimal weight impact, this micro linear servo offers precise surface movement ideal for controlling elevator, rudder, or aileron functions. Its extended lead wire allows for easy routing through the fuselage without needing additional extension cables, making it a seamless repair or maintenance update for your E-flite Timber X and other compatible micro RC aircraft.
Is the E-flite 2.9g Long Lead Linear Servo a direct replacement for the E-flite Timber X?
Yes, the E-flite 2.9g Long Lead Linear Servo is an authentic factory replacement part designed specifically for direct drop-in installation on the E-flite Timber X micro airplane.
What is the main advantage of the long lead wire on the E-flite 2.9g Long Lead Linear Servo?
The extended wire harness length allows you to easily connect the servo to the main receiver/flight controller located further down the fuselage without adding extra wire extensions.
Can I use the E-flite 2.9g Long Lead Linear Servo in other micro RC aircraft?
Yes, provided the target micro RC plane accepts 2.9g linear servos and uses a matching micro plug connector, this servo can serve as a lightweight actuation option.
Customers Also Bought
No related products found.
