14g Metal Gear Servo, 240mm Servo Lead

14g Metal Gear Servo, 240mm Servo Lead

$22.99
Skip to product information
14g Metal Gear Servo, 240mm Servo Lead
Only 2 Left!

14g Metal Gear Servo, 240mm Servo Lead

$22.99
Metal Gear Durable gear train construction
240mm Lead Long wire for easy routing
13g Sub Micro Compact size for lightweight models

In Stock

Part #: SPMSA382
SKU: 100008050
45+ YEARS IN BUSINESSServing since 1978
REPAIR SERVICESRC Cars, Planes, Boats, Drones & More
AUTHORIZED DEALERGenuine products from top brands
FAST SHIPPINGNext day shipping anywhere in the country.
EASY RETURNSIn-stock items returnable within 30 days
Direct Factory Servo ReplacementRestore precise control to your aircraft

Keep your RC airplane flying with peak performance using the 13g Sub Micro MG Servo, 240mm Servo Lead: Beechcraft D18. Designed as an authentic replacement part for the E-flite Beechcraft D18 (EFL106250), this metal gear servo delivers optimal durability and response.

Precision Control for RC FlightDurable metal gears and extended wiring

The 13g Sub Micro MG Servo, 240mm Servo Lead: Beechcraft D18 is built to handle the demands of scale RC airplane control surfaces. Equipped with tough internal metal gears, this sub-micro servo offers smooth torque output and long service life. Featuring an integrated 240mm servo lead, installation into your E-flite Beechcraft D18 airplane is quick and hassle-free, ensuring stable and reliable flight dynamics.

Technical SpecificationsDetailed parameters and part compatibility
Compatible Vehicles E-flite Beechcraft D18 (EFL106250) (plane)
Part Type Sub-Micro Servo
Weight 13g
Lead Length 240mm
Gear Material Metal Gear
Placement/Position Control Surfaces
Key Servo FeaturesEngineered specifically for your aircraft
Factory DirectOfficial replacement for E-flite Beechcraft D18 EFL106250
Metal Gear TrainOffers superior strength and gear train durability
Extended WiringPre-installed 240mm lead simplifies internal routing
Lightweight Build13g weight maintains ideal flight CG balance
Precise ControlProvides sharp actuation for responsive handling
Frequently Asked QuestionsEverything you need to know
Is the 13g Sub Micro MG Servo, 240mm Servo Lead: Beechcraft D18 a direct replacement part?

Yes, this sub-micro servo is a direct factory replacement part engineered specifically for the E-flite Beechcraft D18 (EFL106250) airplane.

Why are metal gears important in the 13g Sub Micro MG Servo?

Metal gears provide enhanced resistance to stripping during high-stress flight maneuvers or minor impacts, offering longer-lasting reliability over plastic gears.

Does the 13g Sub Micro MG Servo, 240mm Servo Lead: Beechcraft D18 include the connection wire?

Yes, it comes with a pre-wired 240mm servo lead attached, making connection to your receiver or extensions easy.